Quote part cards now display a complete material summary, giving you richer sourcing detail at a glance without navigating away.
A new calculator on inventory standard-stock materials shows exactly how many bars to pull and the associated cost breakdown, making material planning faster and more accurate.
When you duplicate a part or reuse it from a previous quote, its attached drawing is automatically copied as an independent file — no need to re-upload.
Using the Create & Send action on an RFQ now reliably marks it as Sent, consistent with other send paths.
Saving a material no longer accidentally zeroes out a cost that was already applied from an RFQ or purchase order.
The cost calculation for standard-stock inventory materials now correctly charges per bar, fixing an overcharge on multi-part runs.
Files opened in a popup viewer now display at the rotation you previously saved, rather than resetting to the default orientation.
Provincial statutory holidays now appear clearly as non-editable entries in the Production Schedule settings, preventing accidental edits.
The holidays table in Shop Schedule settings no longer overflows on mobile or small-screen devices — it now scrolls horizontally as expected.
Erasing both fields in the part-history autofill no longer closes the dropdown, so you can keep browsing suggestions without retyping.
Users who had not yet saved any settings could lose their AI inbox configuration — this is now persisted correctly regardless of account state.
All routes for sending an RFQ now share a single status-transition engine, ensuring consistent behavior whether you send from the list view or the detail page.